In July 2015, our specialists carried out research and methodological work.
The purpose of work - to establish how much effective geophysical exploration in this geological conditions.
Result - our technology worked very well, 2 wells were drilled on 70m then drillers have established the approximate flow rates of wells. It turned out that one well is approximately 2 times more water than the other (4 m3/hour and 2 m3/hour). Geophysicists before drilling gave a similar forecast of more-less.
More information about water prospecting by means of the unique complex of geophysical methods is given here:
Call to us via Viber, Skype, Telegram or Whatsapp +7932-30-54-753