Customer - The administration of the municipal district Plast.
Main tasks:
-
The study of the geological structure and hydrogeological conditions;
-
Tracking zones of tectonic faults and fractures;
-
Selection and justification using geophysical methods of locations for water wells.
Basic methods of solution:
-
Radon survey with localization of fault zones;
-
Resonans-acoustic profiling;
In the best point within exploration area were drilled well to a depth of 105m, a production rate of the well after pumping airlift within 20 hours about 18 m3/h.
More information about water prospecting by means of the unique complex of geophysical methods is given here:
Call to us via Viber, Skype, Telegram or Whatsapp +7932-30-54-753