The works were performed in the vicinity of Davletovo rural area, the Republic of Bashkortostan.
A complex of geophysical methods (BGP and RAP) was applied at the site.
TEM method could not be used because of the close electric power line. As result of the works, the optimum point for water drilling was found (see geophysical profiles below).
Results of drilling:
Well rate is 6 m3/h. Static level – 6m; Dynamic level (under water extraction 4.5 m3/h) - 9m.
More information about water prospecting by means of the unique complex of geophysical methods is given here: